architecture
login
Login
Client Login

YMCA Downtown Regina

The renovation of the downtown YMCA facility has two distinct parts; renovations of the lobby and Men's Plus locker room.

To simplify and enhance traffic flow and security within the building, a complete redesign of the main lobby was required. The Conditioning Centre on the second floor of the building was only accessible through a stair and elevator, which were outside the secure, members-only part of the building. This required arriving members to pass the front desk to access the locker rooms, then again pass back through the lobby to access the Conditioning Centre, leading to traffic congestion and concerns over security. To correct this a new stair was inserted to provide second storey access from within the secure portion of the building. The lobby area was reworked to include meeting and workrooms as well as a servery and small dining area.

The second portion of the project was a complete renovation and refresh of the existing Men's Plus locker room. This included all new finishes and new lockers. The shower, steam, and whirlpool area also feature new upgraded finishes. Lounge and massage room facilities are provided within the new design.

YMCA Downtown Regina
Regina, Saskatchewan
Client: YMCA

Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
Collage 1
sepw-stealth-logo